top of page

Steinway Factory Work

A timelapse from my time working in production at Steinway 

Bosendorfer String Hook Single Hitch Pin Loop

At the Bosendorfer operators use hook similar to this their hands and wire clippers to make the roughly  250 single hitch pin loops

IMG_4218.JPG
IMG_8888.JPG

Damper Installation at the Bechstein Factory 

At Bechstein, we followed efficient and streamlined protocols for installing dampers—no fluff, no extraneous steps. It’s all about precision and effectiveness in every detail

bottom of page